Precautions for Inner Mongolia Electric Power Design to Operate Capacitors
2022-08-15 15:06:50
Maintenance of power capacitor (1) Precautions when operating the capacitor: 1) Under normal circumstances, the power supply of the whole station of Inner Mongolia Power Design shall be cut off, and the capacitor circuit breaker shall be opened first, and then the outgoing circuit breakers; When power is restored, the sequence is reverse. 2) In case of accident, after the power failure of the whole station, the circuit breaker of the capacitor must be
More +