阿拉爱上海同城

 Inside banner

Substation installation

Current location: home page >Substation installation

With the continuous transformation and upgrading of the National Grid Project, the installation and construction of power distribution rooms at all levels are also increasing. As the foundation of the power engineering company, the project power distribution installation is a very good performance of the company's overall strength.

The company has such qualifications as Grade III qualification for urban road lighting contracting, Grade II qualification for power transmission and transformation project contracting, Grade II qualification for electromechanical equipment installation project contracting, Grade III qualification for general contracting of power engineering construction issued by the Inner Mongolia Construction Department, and Grade III, III and III power facility license for installation (repair and test) issued by the East China Electricity Regulatory Bureau of the State Electricity Regulatory Commission. It can undertake the installation of 220KV and below substations, public facilities, communities, factories, schools and other distribution rooms, as well as the transformation of distribution rooms.

The distribution and installation services of Inner Mongolia Qianlong Electric Power Installation Co., Ltd. include: power supply supporting consulting services for construction projects, power capacity increase (capacity reduction) consulting services, substation construction, power transformation and distribution installation, transformation, power grid emergency repair, line installation below 220kv, cable laying, connection, etc. below 220kv.

 Inner Mongolia Power Installation