Inner Mongolia power installation manufacturer's work layout and overall power installation layout!

2022-09-28 10:34:32
second

The overall layout of the power installation project The installation of large and medium-sized power projects must have an overall layout, Inner Mongolia Power Installation First of all, there must be switching power supply, and then switching power supply, power supply installation of mechanical equipment, updating of mechanical equipment, and assembly work must be given priority. Apply for registration of power supply installation enterprises, and clean up the secondary engineering power supply installation, power distribution station, working pressure centrifugal fan, drilling rig, hoisting winch and other assemblies. They have the form of reasonable arrangement, plan and determination.

Plug in regulation of power installation works

After installing the project entity line, the power installation company should carefully check and clean the site to ensure the installation of any mechanical equipment, and then strictly implement the process and system energy transmission sequence during the purification process. Professional and technical personnel, whether for power transmission and distribution or power engineering acceptance, must be supervised by the power installation company and the entrusting enterprise.

Professional knowledge of household power installation engineering machinery and equipment

Once the high voltage switch is installed on the construction machinery equipment for household power installation, the windows and doors must be closed to prevent pollution and water. It is recommended to lay the floor rubber plate on the ground of the power distribution room. The control panel of the high-voltage circuit breaker network cabinet is sealed with colored miscellaneous tape, cleaned regularly, and the distribution room is kept clean. After the distribution box of the factory production line receives kinetic energy, the construction team must carry out daily inspection when entering the distribution room.

Workers who have simple installation of household power engineering must take safety and epidemic prevention measures, Inner Mongolia Power Installation For example, disconnect the main power switch, disconnector, barrier and catalog, and assemble the wire connector; Teachers need to develop certification standards to adapt to the preconditions for starting operations. In the quality management of the installation process point, the quality supervisor shall participate in the on-site inspection, and sign in the quality control plan for assembly if the quality standards are met.

The application software will be cancelled after the work of the household power installation company is completed. After being certified and verified by the operator, after eliminating the relevant insulation layer countermeasures, repair the professional knowledge of household electrical equipment installation and repair the energy transmission. In the cable installation and wiring work, once the task is completed, the control panel of the sealed fireproof cabinet, electrical equipment, household mechanical equipment and the overall packaging must be completed in time to prevent the environmental humidity of the assembly from colliding with the network cabinet between the cable board layer and the network cabinet, resulting in mechanical equipment. This ingredient is wet.

The above is an introduction to the professional knowledge of domestic power installation engineering machinery and equipment. Please remember that the installation quality of power equipment is related to the normal operation of the power supply system. Therefore, the power installation company will take steps to control the quality of the installation equipment.

Inner Mongolia power installation business plate

Class I qualification (municipal engineering, housing construction, steel frame structure, foundation and foundation, environmental protection, fire safety, petrochemical equipment, electromechanical engineering, heating furnace, waterproof, anti-corrosion, thermal insulation, decoration engineering)

Class II qualification (road engineering, water conservancy and hydropower engineering, power engineering, metal curtain wall, ancient architecture, road pavement, road subgrade, river and lake renovation, environmental protection, power transmission and transformation engineering, electronics and intelligence, foundation and foundation, electromechanical engineering installation, landscaping)

 Inner Mongolia Power Installation

Recent browsing: